impworks Logo - a grinning imp in flight

Too Many Ideas - Archive for the ‘My Stuff’ Category

Mrs H.'s Knitting Circle – Away

Sunday, February 10th, 2008

Well after seven drafts I’ve sent Mrs H.’s Knitting Circle off.

Ashes to Ashes or Dempsey and Drakepeace?

Thursday, February 7th, 2008

Really enjoyed the first episode of Ashes to Ashes on BBC 1 tonight. I’ll avoid saying much more because far too easy to drop a spoiler if I do. I did enjoy the switch from Life on Mars’ take on the Sweeney to something more akin to Dempsey and Makepeace or, maybe, The Professionals. Fingers […]

Mrs H.'s Knitting Circle – Fixing the Wandering Tense

Wednesday, February 6th, 2008

I’ve been making some corrections to Mrs H.’s Knitting Circle tonight. One section wandered into the present tense while the rest of the story is pretty much solid past tense. Reading it again the present tense added to the drama – well that’s my excuse and I’m sticking to it. It didn’t fit with the […]

NitS: Edit 1 Half Way There

Sunday, February 3rd, 2008

I passed the 50% mark on the first redraft of NitS tonight. A certain sense of relief tempered by a realisation of how much work I have left to do. This pass has been mainly aimed at picking up all the gross slips in continuity and the plot. By the endo of it I should […]

NitS Inner Story Done

Thursday, January 24th, 2008

Earlier this week I finished the first draft of the inner story that sits at the heart of Night in the Sidhe. It needs a lot of editing. There are lots of scenes that are too short where I sketched over the action to get to the end. I’ve started working my way through it […]

Vue Lighting Rig #14: Another Four Light Rig

Monday, January 21st, 2008

This weeks follows on from last weeks four light rig. This week the lights are again at ninety degrees to each other. The lights have been rotated so we now have a light pointing straight in from the front, one from behind and one from each side. This rig gives us a lot of control […]

Vue Lighting Rig #13: A Four Light Rig

Monday, January 14th, 2008

With improved power supplies, lighting desks that can control more lights in larger theatres it has become possible to use more lights to light an actor. This allows a lighting designer to go from the standard 3 light rig to four light rigs. This weeks rig has four lights set at 90 degrees to each […]

NitS Beginnings and Endings

Sunday, January 13th, 2008

I was worried about the structure of NitS. It lacked a climatic ending and I wasn’t too sure that the opening was really able to grab the reader. As I’ve been working towards the end I’ve discovered not one but two potential climatic confrontations so thats one problem solved. As to the opening I’ve decided […]

I don't make New Year Resolutions…

Thursday, January 10th, 2008

… But if I had and it had been to get a shift on with Night in the Sidhe I’d be doing well so far. Admittedly tidying up the current draft last night actually cut it down by several thousand words. I’ve move note and fragments of story without a home in the current structure […]

Vue Replicate Scale Equal Steps Script

Monday, January 7th, 2008

This Python script for Vue Infinite can be run to equalise (or equalize for all my American readers) the scaling of replicated objects. First you replicate an object in the usual way in Vue (Using Edit -> Replicate) and then you run this script. If you applied a scale to any of the dimensions it […]

impworks © Copyright Mark Caldwell 1996 - 2025